Shedgum Gas Plant

Scope of work: Supply, installation & commissioning services for a cooling tower with a capacity of 400 M3/HR@4NOS. The project scope also included the demolition of existing cooling tower, concrete basin and piping network.

Dar Al Riyadh was also responsible for the civil works for the cooling tower basin construction and installation of 40 CM CS 10″ piping required valves. We also did the modification of existing operation and control panel for fan motor. Fire protection sprinkler system for cooling water and required cables for fan motor was also supplied and installed.

Scope

  • Specification, Installation and Commissioning
  • Industrial Systems & Solutions

Clients

  • Saudi Aramco

Partners

  • SPX
Location
Location
Al Ahsa
Location
Timeframe
2009 — 2009

Related

King Fahad University for Petroleum and Minerals Chilled Water Plant
Dhahran

King Fahad University for Petroleum and Minerals Chilled Water Plant

Scope of work: Replacement of existing university’s AC plant chillers with new vapour absorption chillers. The chiller system serves the chilled water to…

SIDCO Detergent Plant
Dammam

SIDCO Detergent Plant

Scope of work: Design, engineering, supply, construction, and commissioning of a detergent plant. The scope included all the civil and electro-mechanical works. Dar…

Saudi Aramco Corporate Data Center
Dhahran

Saudi Aramco Corporate Data Center

Scope of work: Supply, installation, testing & commissioning of SPX Marley FRP counter flow 6 cells cooling towers along with Lakos side stream filtration…