Salbouk and Buwayb Water Plant

Scope of work: Supply, installation & commissioning services for a new cooling tower for the National water company with a capacity of 400 M3/HR@4NOS. The project scope also included the demolition of existing cooling tower, concrete basin, piping network and electrical items.

Dar Al Riyadh was also responsible for the civil works for the cooling tower basin construction and installation of 120 M SS 12″ piping and 60 M DI 24″ required valves. We also supplied and installed the PLC based operation and control panel for fan motor. The scope also included supplying and installing all required instruments and cables for the fan motor.

Scope

  • Specification, Installation and Commissioning
  • Industrial Systems & Solutions

Clients

  • National Water Company (NWC)

Partners

  • SPX
Location
Location
Multiple Locations
Location
Timeframe
2013 — 2014

Related

King Fahad University for Petroleum and Minerals Chilled Water Plant
Dhahran

King Fahad University for Petroleum and Minerals Chilled Water Plant

Scope of work: Replacement of existing university’s AC plant chillers with new vapour absorption chillers. The chiller system serves the chilled water to…

SIDCO Detergent Plant
Dammam

SIDCO Detergent Plant

Scope of work: Design, engineering, supply, construction, and commissioning of a detergent plant. The scope included all the civil and electro-mechanical works. Dar…

Saudi Aramco Corporate Data Center
Dhahran

Saudi Aramco Corporate Data Center

Scope of work: Supply, installation, testing & commissioning of SPX Marley FRP counter flow 6 cells cooling towers along with Lakos side stream filtration…