Uthmaniya Gas Plant

Scope of work: Supply, installation & commissioning services for a cooling tower with a capacity of 400 M3/HR@4NOS. The project scope also included the demolition of existing cooling tower, concrete basin and piping network.
Dar Al Riyadh was also responsible for the civil works for the cooling tower basin construction and installation of 40 CM CS 10″ piping required valves. We also did the modification of existing operation and control panel for fan motor. Fire protection sprinkler system for cooling water and required cables for fan motor was also supplied and installed.
Scope
- Specification, Installation and Commissioning
- Industrial Systems & Solutions
Client
- Saudi Aramco